National Group's role centered on revitalizing aesthetics through repainting, coupled with essential interior Gib repairs and plastering. The project balanced functionality for staff and students while orchestrating an overhaul within academic term timelines.
Read MoreDowner Queenstown, an infrastructure and asset company, partnered with National Group to maintain multiple crucial and remote bridges in Glenorchy/Queenstown Lakes. The contract involved tasks from top handrail painting through to structural steel refurbishment.
Read MoreNational Group completed a project for Downer New Zealand using our nationwide maintenance service, resulting in impressive outcomes and a satisfied client.
Read MorePorts of Auckland welcomed three new ‘super-cranes’ in 2018, joining the five existing cranes and other key assets on the waterfront in the City Of Sails. The port needed to protect their investment to ensure continued optimal operation and ongoing growth in the future.
Read MoreNational Group have successfully completed over 200 separate jobs, at time’s having up to 6 staff onsite, and work hard to continue reviewing and refining their collaboration with the FM team at Synlait, including via external and internal performance audits.
Read MoreWhile we entrenched a standing Safety Agreement with Citycare and the Wellington City Council, National Group also created detailed specific safety plans for each building or facility. Furthermore, a series of online Learning Management System (LMS) training modules were developed specifically for this portfolio, detailing safety, quality and customer service procedures.
Read MoreCommunication with the client’s management – both onsite and offsite – was a priority. We modified our internal systems to send theatre management text alerts providing real-time updates of onsite/offsite records along with progress and potential problems.
Read MoreCentrePoint turned to National Group to execute this important project. With their proven track record in applying protective coatings at height, National Group were able to undertake the work required efficiently, safely – and most importantly – consistently.
Read MoreThere were so many aspects on this project that had to be done 100% right. The river below needed to be safeguarded to ensure old paint flakes and chemicals didn’t enter the waterways was crucial. From protecting the environment to protecting the public, working with traffic to working through the night, every process needs to be exacting, efficient and absolutely effective.
Read MoreChampion required refurbishment of the seven silos at its Christchurch mill site. The refurbishment required the silos to be sandblasted and painted. Given the scale of the facilities it needed significant scaffolding and the job was to be completed in the fastest possible turnaround and with minimal disruption to the site’s daily operations.
Read MoreFor our team working at Ohau Ski Field, the panoramic scenery of the Mackenzie Country was a major bonus while working here. From a professional standpoint, the final result was a sight to behold too!
Read MoreThere are a lot of moving parts for Ports of Auckland to keep their eye on – maintaining key assets can be a complicated and ever-changing process.
Read MoreAs an architectural showpiece of Queen Street the Auckland Town Hall needed careful exactitude and minimal disruption for its cleaning.
Read More