A costed maintenance plan was developed, which dovetailed neatly into Freshpork’s funding allocations for the project. The plan included weekend work on specific high-use areas to accommodate site operations, as well as independent safety audits to fit both our, and our client’s, stringent health and safety requirements.
Read MoreThe project included refurbishment of the aged machine house floors – including significant grinding and preparation works – reconfiguration of walkways and markings, refurbishment of the blast hall steel doors and surrounds and upgrading of the coatings on the turbine covers.
Read MoreChampion required refurbishment of the seven silos at its Christchurch mill site. The refurbishment required the silos to be sandblasted and painted. Given the scale of the facilities it needed significant scaffolding and the job was to be completed in the fastest possible turnaround and with minimal disruption to the site’s daily operations.
Read MoreFor our team working at Ohau Ski Field, the panoramic scenery of the Mackenzie Country was a major bonus while working here. From a professional standpoint, the final result was a sight to behold too!
Read MoreThere are a lot of moving parts for Ports of Auckland to keep their eye on – maintaining key assets can be a complicated and ever-changing process.
Read MoreAs an architectural showpiece of Queen Street the Auckland Town Hall needed careful exactitude and minimal disruption for its cleaning.