Fonterra Maungaturoto: Group Maintenance Strategy

Case Study: Group Maintenance Strategy

Fonterra Maungaturoto

Addressing the maintenance needs of a Fonterra site is not a simple task of basic cleaning and periodic check-ins.

Firstly, there was a need to establish a site-specific multi-year exterior fabric maintenance plan.

Secondly, they required a reliable company to guide and deliver dependable service throughout the duration of the plan.

Addressing the needs of a Fonterra site is not a simple task of basic cleaning and periodic check-ins. In the case of the Maungaturoto plant, various services were required under their Group Maintenance Strategy (GMS), along with the management of seasonal coatings during the busy annual shutdown period.

Read the full case study below.


Guest User